Sector
Transportation, Aviation and Aerospace
Location
Dubai
Status
Completed
Client
Dubai Aviation Engineering
Architect / Consultant
DAR-ADPi
Main Contractor
Al Shafar General Contracting LLC
The Challenge
Dubai International Airport's Phase III expansion required a solution that addressed the airport's stringent fire safety, security, operational continuity, and passenger movement requirements.
The Dosteen Solution
Dosteen supplied and installed Fire Rated Roller Shutters and Counter Window Shutters designed to meet the project's fire and life safety requirements.
Systems & Products
System NameFire Rated Roller Shutter and Counter Window Shutter
Brand / PartnerDOSTEEN Shutters
Application on ProjectGSEM & ULD Building openings
Quantity / Scale34 nos.
Key Specification083323
Why SelectedThe solution met the project requirements in accordance with the approved design documents and specifications.
The Outcome
Dosteen supplied certified Fire Rated Roller Shutters and Counter Window Shutters (34 Nos.) for the GSEM and ULD Building openings, with approved fire-resistance ratings integrated with the airport's Fire Alarm (FA) and smoke management systems. The systems successfully passed functional, integration, and performance testing, ensuring compliance with fire and life safety requirements, effective fire compartmentation, and enhanced passenger and staff safety.