2013 Dubai International Airport Expansion (Phase lll) @ GSEM Building and ULD Building

2013 Dubai International Airport Expansion (Phase lll) @ GSEM Building and ULD Building
2013 Dubai International Airport Expansion (Phase lll) @ GSEM Building and ULD Building image 2
2013 Dubai International Airport Expansion (Phase lll) @ GSEM Building and ULD Building image 3

Sector

Transportation, Aviation and Aerospace

Location

Dubai

Status

Completed

Client

Dubai Aviation Engineering

Architect / Location

DAR-ADPi

Main Contractor

Al Shafar General Contracting LLC

The Challenge

Dubai International Airport's Phase III expansion required a solution addressing the airport's stringent fire safety, security, operational continuity, and passenger movement requirements.

The Dosteen Solution

Fire Rated Roller Shutter was supplied and Installed for Life and Safety
Solution image 1
Solution image 2

Systems & Products

System NameFire Rated Roller Shutter and Counter Window Shutter
Brand / PartnerDOSTEEN Shutters
Application on ProjectGSEM & ULD Building openings
Quantity / Scale34 nos.
Key Specification083323
Why SelectedAs per project Design documents

The Outcome

Dosteen supplied certified Fire Rated Roller Shutters and Counter Window Shutters (34 nos.) at the GSEM and ULD Building openings, with an approved fire resistance rating integrated with the airport's fire alarm and smoke management systems. All systems successfully passed functional, integration, and performance testing — ensuring compliance with fire and life safety requirements, enhanced fire compartmentation within terminal buildings, and enhanced passenger and staff safety.

Let's Talk About Your Project.