Sector
Transportation, Aviation and Aerospace
Location
Dubai
Status
Completed
Client
Dubai Aviation Engineering
Architect / Location
DAR-ADPi
Main Contractor
Al Shafar General Contracting LLC
The Challenge
Dubai International Airport's Phase III expansion required a solution addressing the airport's stringent fire safety, security, operational continuity, and passenger movement requirements.
The Dosteen Solution
Fire Rated Roller Shutter was supplied and Installed for Life and Safety
Systems & Products
System NameFire Rated Roller Shutter and Counter Window Shutter
Brand / PartnerDOSTEEN Shutters
Application on ProjectGSEM & ULD Building openings
Quantity / Scale34 nos.
Key Specification083323
Why SelectedAs per project Design documents
The Outcome
Dosteen supplied certified Fire Rated Roller Shutters and Counter Window Shutters (34 nos.) at the GSEM and ULD Building openings, with an approved fire resistance rating integrated with the airport's fire alarm and smoke management systems. All systems successfully passed functional, integration, and performance testing — ensuring compliance with fire and life safety requirements, enhanced fire compartmentation within terminal buildings, and enhanced passenger and staff safety.