Cleveland Clinic

Cleveland Clinic
Cleveland Clinic image 2
Cleveland Clinic image 3

Sector

Hospital

Location

Abu Dhabi

Status

Completed

Client

Mubadala Development Company

Architect / Location

WSP

Main Contractor

Besix/ San Jose JV

The Challenge

Cleveland Clinic Abu Dhabi required fire and life safety compliance together with thermal insulation and environmental control, within the constrained space of the loading dock area.

The Dosteen Solution

Fire Rated Roller Shutter & Loading Equipment
Solution image 1
Solution image 2

Systems & Products

System Name Fire Rated Roller Shutter, Dock Equipment
Brand / PartnerMckeon, Blue Giant
Application on ProjectOpening that needs Roller Shutter & Loading Area
Key Specification083323, 111000
Why SelectedAs per project Design documents

The Outcome

Dosteen supplied Fire Rated Insulated Roller Shutters and Dock Equipment (80 nos.) at the openings and loading area requiring roller shutters. The systems were installed, inspected, tested, and commissioned in accordance with project documents and applicable fire and safety standards — ensuring reliable operation of both the fire rated roller shutter and dock equipment, safe operation, fire protection, thermal efficiency, compliance with local fire codes, authority requirements and hospital fire strategies, and uninterrupted hospital logistics operations.