The Challenge
Cleveland Clinic Abu Dhabi required compliance with fire and life safety regulations while maintaining thermal insulation and environmental control within the confined space of the loading dock area.
The Dosteen Solution
Dosteen supplied Fire Rated Insulated Roller Shutters and Dock Equipment designed to meet the project's fire protection, thermal insulation, and loading dock operational requirements.
Systems & Products
System Name Fire Rated Roller Shutter, Dock Equipment
Brand / PartnerMckeon, Blue Giant
Application on ProjectLoading Area and Openings Requiring Roller Shutters
Quantity / Scale80 Nos
Key Specification083323, 111000
Why SelectedThe solution met the project requirements in accordance with the approved design documents and specifications
The Outcome
Dosteen supplied Fire Rated Insulated Roller Shutters and Dock Equipment (80 Nos.) for the loading area and designated openings. The systems were installed, inspected, tested, and commissioned in accordance with the project documents and applicable fire and safety standards, ensuring reliable operation, effective fire protection, thermal efficiency, compliance with local fire codes and hospital fire strategies, and uninterrupted hospital logistics operations.