The Challenge

Cleveland Clinic Abu Dhabi required compliance with fire and life safety regulations while maintaining thermal insulation and environmental control within the confined space of the loading dock area.

The Dosteen Solution

Dosteen supplied certified Fire Rated Insulated Roller Shutters with the required fire resistance rating and thermal performance, along with Dock Equipment with a sufficient operating range. The systems were designed to meet the project's fire protection and loading dock operational requirements.
Solution image 1
Solution image 2

Systems & Products

System Name Fire Rated Roller Shutter, Dock Equipment
Brand / PartnerMcKeon, Blue Giant
Application on ProjectLoading Area and Openings Requiring Roller Shutters
Quantity / Scale80 Nos.
Key Specification083323, 111000
Why Selected The solution was selected to ensure reliable operation of both the Fire Rated Insulated Roller Shutters and Dock Equipment in line with project requirements. It also supported compliance with local fire codes, authority requirements, and hospital fire strategies.

The Outcome

Dosteen supplied 80 Nos. of Fire Rated Insulated Roller Shutters and Dock Equipment, which were installed, inspected, tested, and commissioned in accordance with the project documents and applicable fire and safety standards. The systems ensured safe operation, effective fire protection, thermal efficiency, and uninterrupted hospital logistics operations.