DMCC UPTOWN PHASE 2

DMCC UPTOWN PHASE 2

Sector

Technology & Service Industry

Location

Uptown Dubai District

Status

Completed

Client

DMCC

Architect / Consultant

BSBG

Main Contractor

DBB CONTRACTING LLC

The Challenge

DMCC Uptown Phase 2 required effective fire protection for its atrium despite the complex ceiling geometry, while achieving fire and life safety compartmentation and seamless integration with the building's Fire Alarm (FA) system.

The Dosteen Solution

Dosteen supplied Concertina "Open" FireMaster Fire Curtains for the Podium Lift Lobby. The system was designed to accommodate the complex ceiling geometry while providing an automatically deployable fire protection solution.
Solution image 1
Solution image 2

Systems & Products

Systems Name Concertina "Open" FireMaster Fire Curtain
Brand / PartnerCoopers Fire Limited
Application on ProjectPodium Lift Lobby
Quantity / Scale2 nos.
Key Specification078700
Why SelectedThe Fire Curtain was selected to meet the project's fire and life safety requirements while accommodating the architectural constraints of the lift lobby and supporting automatic operation during a fire event.

The Outcome

The two FireMaster Fire Curtains provided effective fire compartmentation within the Podium Lift Lobby while maintaining compatibility with the building's architectural design. The installation delivered the required fire resistance, operational reliability, and occupant safety performance.