Dubai International Airport Expansion (Phase III) – GSEM Building & ULD Building

Dubai International Airport Expansion (Phase III) – GSEM Building & ULD Building
Dubai International Airport Expansion (Phase III) – GSEM Building & ULD Building image 2
Dubai International Airport Expansion (Phase III) – GSEM Building & ULD Building image 3

Sector

Transportation, Aviation and Aerospace

Location

Dubai

Status

Completed

Client

Dubai Aviation Engineering

Architect / Consultant

DAR-ADPi

Main Contractor

Al Shafar General Contracting LLC

The Challenge

Dubai International Airport’s Phase III expansion required a solution that addressed stringent fire safety, security, operational continuity, and passenger movement requirements.

The Dosteen Solution

Dosteen supplied and installed certified Fire Rated Roller Shutters with approved fire resistance ratings for the GSEM and ULD Building openings. The systems were integrated with the airport’s Fire Alarm (FA) and smoke management systems to support the required fire and life safety performance.
Solution image 1
Solution image 2

Systems & Products

System NameFire Rated Roller Shutter and Counter Window Shutter
Brand / PartnerDOSTEEN Shutters
Application on ProjectGSEM & ULD Building Openings
Quantity / Scale34 Nos.
Key Specification083323
Why SelectedThe Fire Rated Roller Shutters were selected to comply with fire and life safety requirements while enhancing fire compartmentation within the terminal buildings. The solution also supported enhanced safety for passengers and staff.

The Outcome

Dosteen supplied 34 Fire Rated Roller Shutters and Counter Window Shutters, with all systems successfully passing functional, integration, and performance testing. The installation ensured effective fire compartmentation, operational reliability, and compliance with airport safety requirements.