DWTC Phase 1 & 2

DWTC Phase 1 & 2
DWTC Phase 1 & 2 image 2
DWTC Phase 1 & 2 image 3

Sector

Business/Commercial

Location

Dubai

Status

Completed

Client

DWTC

Architect / Consultant

WSP

Main Contractor

Al Futtaim Construction LLC

Overview

Dubai World Trade Centre (DWTC) Phase 1 & 2 required a dependable passive fire protection solution to safeguard occupants and maintain effective fire compartmentation across the development.

The Challenge

The development required reliable fire protection systems to safeguard occupants and limit the spread of fire during an emergency. The solution had to maintain effective fire and life safety compartmentation and protect lift lobby areas from fire spread. It also had to meet stringent passive fire protection and regulatory requirements and ensure reliable performance under emergency conditions.

The Dosteen Solution

Dosteen supplied an integrated fire curtain solution designed to deliver effective compartmentation while meeting the project’s fire and life safety requirements. The solution comprised Firemaster Fire Curtains by Coopers Fire Limited, integrated into the building’s passive fire protection strategy to provide effective fire compartmentation for lift lobby areas. The system was installed and commissioned in accordance with approved shop drawings and manufacturer recommendations, in compliance with NFPA requirements and the UAE Fire & Life Safety Code.
Solution image 1
Solution image 2

Systems & Products

System NameFireMaster Fire Curtain
Brand / PartnerCoopers Fire Limited
Application on ProjectLift Lobby
Quantity/Scale100 Nos.
Key Specification078700
Why SelectedThe Firemaster Fire Curtains were selected for their ability to provide effective passive fire compartmentation while integrating seamlessly with the building’s life safety strategy. Their certified performance and reliable emergency operation supported compliance with NFPA requirements and the UAE Fire & Life Safety Code.

The Outcome

The Firemaster Fire Curtain system was successfully installed, tested, and commissioned, delivering reliable fire compartmentation and enhanced life safety protection within the project.