DWTC Phase 1 & 2

DWTC Phase 1 & 2
DWTC Phase 1 & 2 image 2
DWTC Phase 1 & 2 image 3

Sector

Business/Commercial

Location

Dubai

Status

Completed

Client

DWTC

Architect / Consultant

WSP

Main Contractor

Al Futtaim Canstruction LLC

The Challenge

DWTC Phase 1 & 2 required effective fire and life safety compartmentation throughout the building while ensuring compliance with the project's fire protection requirements.

The Dosteen Solution

Dosteen supplied FireMaster Fire Curtains engineered to provide reliable fire compartmentation and life safety protection across designated building zones.
Solution image 1
Solution image 2

Systems & Products

System NameFiremaster Fire Curtain
Brand / PartnerCoopers Fire Limited
Application on ProjectLift Lobby
Quantity/Scale100 Nos
Key Specification078700
Why SelectedThe solution met the project requirements in accordance with the approved design documents and project specifications

The Outcome

Dosteen supplied 100 FireMaster Fire Curtains for the lift lobby, functioning as an integrated fire and life safety solution. The system was successfully installed, tested, and commissioned in accordance with the approved shop drawings, manufacturer recommendations, NFPA requirements, and the UAE Fire & Life Safety Code, delivering effective fire compartmentation, reliable emergency performance, and full compliance with the project's passive fire protection requirements.