DWTC Phase 1 & 2

DWTC Phase 1 & 2
DWTC Phase 1 & 2 image 2
DWTC Phase 1 & 2 image 3

Sector

Business/Commercial

Location

Dubai

Status

Completed

Client

DWTC

Architect / Location

WSP

Main Contractor

Al Futtaim Canstruction LLC

The Challenge

DWTC Phase 1 & 2 required life and safety compartmentation across the building.

The Dosteen Solution

Fire Curtain to separate the two zone at the time of fire
Solution image 1
Solution image 2

Systems & Products

System NameFiremaster Fire Curtain
Brand / PartnerCoopers Fire Limited
Application on ProjectLift Lobby
Key Specification078700
Why SelectedAs per Design & specificaiton of the project

The Outcome

Dosteen supplied Firemaster Fire Curtains (100 nos.) at the lift lobby, functioning as an integrated life-safety product. The system was successfully installed, tested, and commissioned in accordance with approved shop drawings, manufacturer recommendations, NFPA requirements, and the UAE Fire & Life Safety Code — strictly achieving the requirement for a passive fire protection system and ensuring reliable performance during emergency conditions, with effective compartmentation and life safety protection.