Sector
Transportation
Location
Dubai
Status
Completed
Client
Government of Dubai – RTA
Architect / Consultant
W.S. Atkins
Main Contractor
JT Metro / ICGL / Fino International / Linder Depa
Overview
The Dubai Metro Green & Red Line project required reliable fire protection systems to support safe passenger movement and meet the stringent life safety standards of one of the region's busiest public transport networks.
The Challenge
The project demanded certified fire-rated solutions that complied with strict UAE fire and life safety regulations while integrating seamlessly with the metro's fire alarm control system.
The Dosteen Solution
Dosteen supplied Fire Rated Roller Shutters designed to provide effective fire compartmentation for lobbies and critical openings. The systems were fully integrated with the Fire Alarm Control Panel, ensuring dependable performance during emergencies.
Systems & Products
System NameFire Rated Roller Shutter
Brand / PartnerDOSTEEN Shutters
Application on ProjectLobby area and openings that need closing for compartmentation of the area in terms of Life & Safety.
Quantity / Scale200+ Nos.
Key Specification083323
Why SelectedDosteen’s Fire Rated Roller Shutters were selected for their ability to meet the Dubai Metro’s stringent fire and life safety requirements while providing reliable fire compartmentation. The approved systems offered the required fire resistance and seamless integration with the Fire Alarm Control Panel, supporting enhanced passenger safety and protection of critical metro infrastructure.
The Outcome
The installed Fire Rated Roller Shutters successfully delivered reliable fire compartmentation, seamless system integration, and compliance with metro and UAE fire safety requirements, helping enhance passenger safety and protect critical transport infrastructure.






