Emaar Beach Front, Dubai Harbour Development Beach Vista Residential Building

Emaar Beach Front, Dubai Harbour Development Beach Vista Residential Building

Sector

Residential

Location

Dubai

Status

Completed

Client

Emaar Development P.J.S.C.

Architect / Consultant

Rice Perry Ellis

Main Contractor

Nurol LLC

The Challenge

Beach Vista at Dubai Harbour required a waste management solution that addressed sanitation, hygiene, fire safety, odour control, and operational efficiency for a high-rise residential development.

The Dosteen Solution

Dosteen supplied a Downwaste Garbage Chute System designed to provide safe, hygienic, and efficient waste management while meeting the project's operational and fire safety requirements.
Solution image 1
Solution image 2

Systems & Products

System NameGarbage Chute System
Brand / PartnerDownwaste
Application on ProjectGarbage Room
Quantity / Scale1 no.
Key SpecificationN10-970
Why SelectedThe solution met the project requirements in accordance with the approved design documents and project specifications.

The Outcome

Dosteen supplied a Downwaste Garbage Chute System (1 No.) extending from the upper floors to the basement garbage room. The system incorporated fire-rated components, automated cleaning systems, ventilation, acoustic treatments, and smart waste management features, delivering effective control of fire and smoke propagation, odour, noise, and hygiene while maintaining compliance with project and regulatory requirements.