The Grand, Dubai Creek HARBOUR

The Grand, Dubai Creek HARBOUR

Sector

Residential

Location

Dubai

Status

Completed

Client

The Lagoons Phase Obe LLC

Architect / Location

ATK Engineering Consultants

Main Contractor

Al Basti & Muktha LLC

The Challenge

The Grand at Dubai Creek Harbour required a waste management solution addressing sanitation and hygiene, fire safety, odour control, and operational efficiency for a large residential population.

Systems & Products Name

A product that clear the garbage from a building
Solution image 1
Solution image 2

Systems & Products

System NameGarbage Chuter
Brand / PartnerDownwaste
Application on ProjectGarbage Room
Quantity / Scale1 no.
Key SpecificationN10-970
Why SelectedAs per project Design documents

The Outcome

Dosteen supplied a Downwaste Garbage Chuter (1 no.) running from the higher floor levellers to the basement garbage room, incorporating fire rated doors, a sprinkler at every floor, and mechanical exhaust — designed for the large residential population generating a significant volume of waste. The system delivered efficient waste handling, reduced operations cost, improved reliability, and a simplified future maintenance procedure.