Sector
Residential
Location
Dubai
Status
Completed
Client
The Lagoons Phase One LLC
Architect / Consultant
ATK Engineering Consultants
Main Contractor
Al Basti & Muktha LLC
The Challenge
The Grand at Dubai Creek Harbour required a waste management solution that addressed sanitation, hygiene, fire safety, odour control, and operational efficiency for a large residential community.
The Dosteen Solution
Dosteen supplied a Downwaste Garbage Chute System designed to provide safe, hygienic, and efficient waste management while meeting the project's operational and fire safety requirements.
Systems & Products
System NameGarbage Chute System
Brand / PartnerDownwaste
Application on ProjectGarbage Room
Quantity / Scale1 no.
Key SpecificationN10-970
Why SelectedThe solution met the project requirements in accordance with the approved design documents and project specifications.
The Outcome
Dosteen supplied a Downwaste Garbage Chute System (1 No.) extending from the upper floors to the basement garbage room. The system incorporated fire-rated hopper doors, sprinklers on every floor, and a mechanical exhaust system to support efficient waste disposal for the residential development. It delivered reliable waste handling, reduced operational costs, improved hygiene, and simplified long-term maintenance.



