Nad Al Sheba Gardens Phase 2

Nad Al Sheba Gardens Phase 2

Sector

Residential

Location

Dubai

Status

Completed

Client

Dubai Holding Real Estate

Architect / Consultant

CONIN

Main Contractor

Intermass Engineering & Contracting Co. LLC

The Challenge

The Nad Al Sheba Gardens Phase 2 project required a garage door solution capable of overcoming design, construction, procurement, and operational challenges while ensuring long-term performance.

The Dosteen Solution

Dosteen supplied Garage Bi-Fold Doors engineered to provide wind resistance, water leakage protection, operational safety, consistent aesthetics, and long-term durability.

Systems & Products

System NameGarage Bi-Fold Door
Brand / PartnerSCHWEISS
Application on ProjectGarage Area
Quantity / Scale93 Nos.
Key Specification08 11 10
Why SelectedThe solution met the project's quality and safety requirements while enhancing durability against environmental conditions and delivering a consistent architectural appearance.

The Outcome

Dosteen successfully supplied and installed 93 Garage Bi-Fold Doors for the villa development. Through early coordination, standardised installation procedures, and rigorous quality control, the project achieved consistent operational performance, weather resistance, aesthetic uniformity, and timely project handover.